Main lab power breakers and outlets

all loads in Watts, Italics: not a permanent load, Blue: KCO and C4

Main lab>>>>>

2nd room >>>>>>>>>

House>>>>>>>>>>

Phase #

Outlet

Load

SUM

SUM

Remarks

AC1

AC2

Inside

Outside

Tools

Tower

ASD

GC

CO

DAQ_BSI

PCs

UMd

Miami

Cachier

Shaw

Ogren

Annegarn

AC3

KCO4

DOAS

CalTec

UCR

GPS

µWave

PTR-MS

Valero

MPL

House

ISS

O3

Breaker #

A/220

kW

lights

lights

cal lamp
raw 110

&pump

printers, phone, fax PCs

1, 2, 3

O3/SO2

full

full

full

full

full

fridge

pumps

main lab

water

radiometer

Lidar

/GLASS

sondes

#1 - RED

1

Cachier

3.4

0.7

(5)

748

to 2nd lab:

1

UPS#1, GPS, KCO4, µWave Rad. Air hood on raw power

8.0

1.7

(5)

429

231

660

429

2

AC #1 / East Window / power tools

5.9

1.3

(5)

880

407

3

Annegarn

1.0

0.2

(5)

220

4

Lights back room, 1 kW outside light

5.6

1.2

(5)

240

1000

to 2nd lab:

5

DOAS full load (in 2nd room

3.4

0.8

(5)

750

6

Lights main lab: can get more load

2.5

0.6

(5)

560

sum main lab RED (A/kW)

29.8

6.6

(3)

#2 YELLOW

7

cannot be used (do NOT use for Ogren!!)

0.0

0.0

(5)

8

AC #2 / UPS2: CO/O3/SO2, Tower

14.0

3.1

(5)

880

1490

418

300

9

Miami aerosols to alcove, raw 220 V pumps

9.1

2.0

(5)

2000

10

Miami aerosols instruments

2.3

0.5

(5)

500

11

Alcove, 220 V raw power, Ogren pump, Cachier pump

6.6

1.5

(5)

748

704

12

Air lock, entrance light??

0.0

0.0

(5)

sum main lab YELLOW (A/kW)

32.0

7.0

(3)

#3 BLUE

13

outside tower, 1 kW light

4.5

1.0

(5)

1000

14

Ogren instruments

7.3

1.6

(5)

1606

15

outside front door, 1 kW light

4.5

1.0

(5)

1000

16

UPS 4: PCs, phone, fax, DAQ, BSI, KCO1&2, Tower

8.3

1.8

(5)

616

616

583

17

UPS 3: GC, high load, incl GC pump (reroute!!!)

4.1

0.9

(5)

900

18

outside window, 1 kW light

4.5

1.0

(5)

1000

sum main lab BLUE (A/kW)

33.3

7.3

(3)

Small lab power breakers and outlets

Phase #

Outlet

Breaker #

#1 - RED

19

UCR ATOF-MS

12.0

2.6

(5)

2640

20

UCR ATOF-MS (OR: one 40 A line)

12.0

2.6

(5)

2640

21

UCR ATOF-MS

12.0

2.6

(5)

2640

29

direct 40 A line for UCR(only used instead of 19-21)

sum 2nd lab RED (A/kW)

36.0

7.9

(3)

#2 YELLOW

22

xFormer,raw pump power 110 V, Valero

2.3

0.5

(5)

*

500

23

AC3, more CalTec filter pumps/instruments

14.0

3.1

(5)

1320

1760

24

Shaw pumps

6.0

1.3

(5)

1320

*

to main lab:

25

Shaw high load to other room

11.0

2.4

(5)

2420

sum 2nd lab YELLOW (A/kW)

33.3

7.3

(3)

#3 BLUE

26

PTR-MS and 2 CalTec MOUDIs 220 V (feedthrough)

4.5

1.0

(5)

*

990

27

CalTec 2 MOUDIs, Dichot (needs feed-through the wall)

0.0

0.0

(5)

*

28

MPL Lidar, weatherized outlet to roof

5.0

1.1

(5)

1089

direct line

30

House incl GLASS and O3 sondes

25.6

5.6

(5)(6)

3960

1270

200

200

sum 2nd lab and house BLUE (A/kW)

35.0

7.7

(3)

Restrictions:

(1) main power consumption cannot exceed 55 kW or 240 Ampere at 220 V (100 A at 400 V) (total breaker restriction)

(2) Combined, single phase load cannot exceed 18.5 kW or 84 Amperes at 220 V (phase restriction)

(3) Single phase load for each lab cannot exceed 40 Amperes at 220 V (distribution breaker restriction)

(4) combined, permanent load should not exceed 33 kW (supply restriction)

(5) load on any single outlet cannot exceed 16 Ampere (outlet restriction), except for direct 40 A lines

(6) House has several outlets and can carry up to 40 A total load (8.8 kW)